Tuesday, 5/13/2008
Click on an icon within the map to view more information. Note: 9-1-1 incidents can only be plotted on the map if they are reported by cellular phone.
NYSDOT Incidents, Severity 1
9-1-1 Incidents
NYSDOT Incidents, Severity 2
Construction
NYSDOT Incidents, Severity 3
Accident, on I-90 WB at I-90
Severity: 2
Direction: WB
accident on I 90 NYS Thruway westbound between Exit 48 I 90 Batavia Rte 98 and Exit 48A I 90 Pembroke Rte 77 for the next hour Effective Dates : Starting on 05 13 08 03:26 PM until 05 13 08 04:26 PM
Roadway reduced to one lane, on I-490 EB at INNER LOOP
Severity: 3
Direction: EB
reduced to one lane on I 490 eastbound from Inner Loop to Genesee River until 3:00 PM, 08 08 08
Roadway reduced to one lane, on I-490 WB at MAIN ST
Severity: 3
Direction: WB
reduced to one lane on I 490 westbound from Main Street to Broads Street starting 9:10 PM, 04 07 08 until 2:00 AM, 11 15 08
Lane closed, on RT-15A at CR-85
Severity: 2
Direction: N/A
long term road construction on NY 15A in both directions from Townline Road; County Route 85 to I 390 until 4:30 PM, 11 21 08Comment: Long term road reconstruction on Route 15A East Henrietta Road from north of Brighton Henrietta Town Line Road to I 390 Exit 16 for installation of new storm drainage and relocation of utilities. Daily lane closures will occasionally be required.
Construction work, on RT-77 at TOWN SHELDON
Severity: 2
Direction: N/A
construction work on NY 77 between Town Sheldon; Town Bennington and Route 354 starting 7:00 AM, 09 10 07 until further noticeComment: Culvert replacement at Rte 77 over the Tributary of Cayuga Creek will begin September 10, 2007 and is anticipated to progress into December. Minor traffic delays may occur when flagging operations are necessary however; much of the work will be performed off the highway.
Road maintenance operations, on RT-63 at TOWN OF OAKFIELD
Severity: 2
Direction: N/A
single line traffic alternating directions, road maintenance operations on NY 63 in both directions from Town of Oakfield; Town of Alabama to Route 77 Start Overlap until 3:00 PM, 05 23 08
Bridge maintenance operations, on RT-259 at TOWN OF OGDEN
Severity: 1
Direction: N/A
bridge maintenance operations on NY 259 at Town of Ogden; Town of Parma Effective Dates : Starting on 05 01 08 01:09 PM until further notice
Road construction, on RT-104 at LONG POND RD
Severity: 2
Direction: N/A
long term road construction on NY 104 from Long Pond Road Southbound to Fetzner Road Effective Dates : Starting on 12 17 07 07:00 AM until further noticeComment: The southern portion of Ridge Road is currently under construction. Work to be completed is the removal of existing pavement, completion of drainage installation, installation of new curb, sidewalk and new asphalt pavement. All work is to take place in the currently closed off south portion of Ridge Rd. Two lanes of travel in either direction with a center lane lane is in effect throughout this period. Minimal traffic disruption may occur when construction vehicles enter or exit the work zone. Once the southern portion is constructed, traffic will be re directed to north and south sides of Ridge road so the median portion can be constructed. This work is anticipated to begin in July with final top course asphalt and striping to be completed by October.
Shoulder closed, on I-390 SB at RT-33
Severity: 1
Direction: SB
right shoulder closed on I 390 southbound from Route 33 to Route 33A until 3:00 PM, 05 15 08
Road construction, on RT-31 EB at RT-250
Severity: 2
Direction: EB
road construction on NY 31 eastbound from Route 250 to Turk Hill Road County Route 50 starting 8:00 AM, 05 05 08 until 4:00 PM, 06 30 08Comment: Roadwork to start May 5, 2008 to June 30, 2008 on Rte 31 from Rte 250 to Turk Hill Rd 8 am to 4 pm
Paving operations, on RT-31 at CR-52
Severity: 2
Direction: N/A
single line traffic alternating directions on NY 31 in both directions from Victor Road County Route 52 to Town of Macedon; Village of Palmyra due to paving operations starting 8:30 AM, 04 21 08 until 4:30 AM, 07 31 08Comment: Sporatic Alternating One Way traffic pattern from Aldrich Rd to Macedon Palmyra town line. Watch for and obey Flaggers.
Paving operations, on RT-414 at RT-96
Severity: 2
Direction: N/A
paving operations on NY 414 in both directions from Route 96 Junction to Route 336 South of Fayette due to paving operations starting 6:53 AM, 05 13 08 until 5:00 PM, 05 14 08Comment: Milling and paving at intersection of Route 96 Route 414, and near the intersection of Route 336 at Route 96.Alternating one way traffic.
at 02 PATTONWOOD DR, Rochester City
Status: WAITING
Date: 5/13/2008
Time: 04:21 PM
ID: CTYP081342092
at 97 ROHR ST, Rochester City
Status: WAITING
Date: 5/13/2008
Time: 04:18 PM
ID: CTYP081342080
at 51 TARWOOD DR, Gates Town
Status: ONSCENE
Date: 5/13/2008
Time: 04:08 PM
ID: GATP081342033
at 3931 ST PAUL BL, Irondequoit Town
Status: DISPATCHED
Date: 5/13/2008
Time: 03:48 PM
ID: IROP081341951
at EAST AV/S GOODMAN ST, Rochester City
Status: DISPATCHED
Date: 5/13/2008
Time: 02:29 PM
ID: CTYP081341679
