Skip navigation.

Login | Register | Help | Contact Us | FAQ | Site Map

Thursday, 7/2/2009

Traffic Conditions
Incident Direction Severity
Closed, on I-390 SB at EXIT 6SB4
I-390 closed to traffic on I 390 southbound from Exit 6 NY 36 to Exit 5 McWhorter Road until 5:00 PM, 09 08 09Comment: Closed to traffic for culvert repairs. Detour is in place.
Closed, on RT-258 at TOWN OF GROVELAND AND TOWN OF WEST SPARTA LINEN/A4
closed on NY 258 from Town of Groveland and Town of West Sparta Line to NY 63 North; END ROUTE due to closed for the next six months Effective Dates : Starting on 03 16 09 11:54 AM until 09 12 09 11:54 AM
Lane closed, on US-20 at TOWN OF CALEDONIA AND TOWN OF AVON LINEN/A2
major road construction on US 20 in both directions from Town of Caledonia and Town of Avon Line to Avon East Avon Road; US 20 starting 7:14 AM, 06 15 09 until 7:00 PM, 10 31 09Comment: Lane closures and lane shifts will be in place.
Lane closed, on RT-414 at TOWN OF FAYETTEN/A2
road maintenance operations on NY 414 from Town of Fayette; Town of Varick Line to before Cayuga Street; US 20 until 3:00 PM, 08 27 09Comment: Traffic Control with lane closures and alternating one way traffic. Minor delays
Road construction, on I-490 at THE INNER LOOP RAMPS BEGIND FRONTIER FIELDN/A2
I-490 major road construction on I 490 in both directions from I 390 to Exit 15 Rochester Inner Loop Highway until 3:00 PM, 11 13 09Comment: Motorists using I490 can expect delays beginning Saturday 3 14 09 as construction resumes for the Western Gateway Project. Traffic changes will begin Saturday 3 14 on the WB lanes beginning at the Inner Loop Ramp. WB traffic will be reduced to a single lane once again between the Inner Loop Ramps begind Frontier Field and will remain that way until late summer. WB Traffic from Grape Str. to the 390 interchange will be shifted to the far right lane and shoulder also beginning Saturday 3 14. All WB ramps will remain open with the exception of the Ames Str. on ramp which will close Saturday 3 14. A detour will be posted to Mt. Read Blvd. Beginning Tuesday night 3 17, the 390SB to 490 EB Ramp will again be reduced to a single lane in preparation for the switching of the EB traffic onto the current WB side of the expressway. Weather permitting this
Road construction. Expect slow traffic, on RT-65 at RT-252N/A2
long term road construction on NY 65 in both directions at West Jefferson Road; NY 252 until 4:00 PM, 11 30 09; right lane closed on NY 65 in both directions at West Jefferson Road; NY 252 until 4:00 PM, 07 30 09; reduced to one lane on NY 252 in both .Comment: NYSDOT Contract D260802 Work continues on the Rts. 65 252 Intersection Improvement contract, in the Town of Pittsford. Contract work also includes improvements to the Lock 32 Canal Park and the adjacent tow path. Work is schedulede to be completed by November 2009. Additional information is available at 585 383 0136.LONG TERM RIGHT LANE CLOSURES Right lane closures for pavement widening, both north and southbound on Route 65 from Framingham to Tobey Road.DAILY WORK ZONE: Flagging operation east of Rt. 252 65 Intersection. One way alternating traffic. Expect Delays.
Picture of American flag.

Quick Links