Traffic Conditions
| Incident |
Direction |
Severity |
|---|
| Roadway reduced to one lane, on RT-98 NB at RT-63 | NB | 3 |
|
road maintenance operations, reduced to one lane on NY 98 northbound from Route 5; Route 63 to I 90 Ramp until 4:00 PM, 10 10 08 |
| Closed, on LAKE ONTARIO STATE PKY at CR-132 | N/A | 4 |
|
closed on Lake Ontario State Parkway in both directions at Dewey Avenue County Route 132 starting 7:00 AM, 06 02 08 until 6:00 PM, 10 31 08 |
| Roadway reduced to one lane, on I-490 WB at MAIN ST | WB | 3 |
reduced to one lane on I 490 westbound from Main Street to Broads Street starting 9:10 PM, 04 07 08 until 2:00 AM, 11 15 08 |
| Incident, on RT-96 at RT-444 | N/A | 2 |
|
restrictions lifted on NY 96 from Route 444 to Village of Victor; Town of Victor starting 2:00 PM, 08 13 08 until further noticeComment: Rte 96 Bridge over OCRR and Great Brook in the Town of VIctor will be opened to traffic on August 13, 2008 at 1:30pm following Ribbon Cutting Ceremony. THANK YOU TO THE TRAVELING PUBLIC FOR THEIR PATIENCE |
| Road construction, on US-20 at TOWN OF CALEDONIA | N/A | 2 |
|
long term road construction on US 20 in both directions from Town of Caledonia; Village of Avon to Village of Avon; Town of Avon until 4:00 PM, 12 31 09Comment: Construction project for the rehabilitation of Routes 5 20 in the Village of Avon from River St. on the East to thewest Village line. |
| Road construction, on RT-104 at LONG POND RD | N/A | 2 |
|
long term road construction on NY 104 from Long Pond Road Southbound to Fetzner Road Effective Dates : Starting on 12 17 07 07:00 AM until further noticeComment: The southern portion of Ridge Road is currently under construction. Work to be completed is the removal of existing pavement, completion of drainage installation, installation of new curb, sidewalk and new asphalt pavement. All work is to take place in the currently closed off south portion of Ridge Rd. Two lanes of travel in either direction with a center lane lane is in effect throughout this period. Minimal traffic disruption may occur when construction vehicles enter or exit the work zone. Once the southern portion is constructed, traffic will be re directed to north and south sides of Ridge road so the median portion can be constructed. This work is anticipated to begin in July with final top course asphalt and striping to be completed by October. |
| Road construction, on RT-15A at CR-85 | N/A | 2 |
|
long term road construction on NY 15A in both directions from Townline Road; County Route 85 to I 390 until 4:00 PM, 11 26 08Comment: Route 15A East Henrietta Road between Brighton Henrietta Town Line Road and I 390 Exit 16B in front of Monroe Community College . There will be periodic daily lane closures to allow crews to complete sidewalk, drainage, traffic signal and landscape work. Most lane closures will be in the southbound direction and restricted to off peak hours. |
| Paving operations, on US-20 at RT-5 | N/A | 2 |
|
paving operations, single line traffic alternating directions on US 20 from Livingston Ontario County Line; Route 5 to Route 444 due to road maintenance operations until 5:00 PM, 10 10 08 |
| Road construction, on RT-286 at BLOSSOM RD | N/A | 2 |
|
road construction on NY 286 at Blossom Road until 4:00 PM, 11 30 08Comment: Long Term DETOURS at the intersection of Rte 286 and Blossom Rd. Creek St. WATCH FOR AND FOLLOW DETOUR SIGNS |
| Construction work, on RT-414 at TOWN OF GALEN | N/A | 2 |
|
construction work on NY 414 in both directions from Town of Galen; Town of Rose to Town of Rose; Town of Huron due to bridge construction starting 7:00 AM, 10 08 08 for the next monthComment: Culvert work on 414 at Valley Drive in Rose. Expect long term shoulder closures with intermittent flagging. |